Complete closure in Dingolfing: Reisbacher Straße and Griesgasse affected!
On June 14, 2025, Reisbacher Straße in Dingolfing will be completely closed. The reason is demolition work. Diversions have been set up.

Complete closure in Dingolfing: Reisbacher Straße and Griesgasse affected!
There is important news regarding the traffic situation in Dingolfing today, June 13, 2025. Starting tomorrow, drivers will face a full closure, which will severely affect Reisbacher Straße. This will be closed between the “Lampl-Paß” roundabout and Glück-Eck until at least Monday, June 16th. The closure is due to demolition work on an adjacent building complex on the corner of Reisbacher Straße and Griesgasse, like dingolfing-landau.de reported.
There is a diversion for traffic from Frichlkofen and the eastern bypass that leads over the “Lampl Pass” to the “Rathaus-Kreuzung” and then via Wollanger and Auenweg to the state road 2111 to the Herrenweiher and back. Residents and all road users are asked to understand this inconvenience.
Additional closures in prospect
But it's not just Reisbacher Straße that is affected. Another full closure is already scheduled for October: From October 14, 2024, Bahnhofstrasse in Dingolfing will also be closed in the area of the access to BayWa up to the curve area and the access to the BMW North parking lot. These measures are part of the upcoming construction phase II and are scheduled to be completed by mid-December dingolfing.de communicates.
The diversion for Bahnhofstrasse remains unchanged: Drivers coming from the direction of the “Finsterwald-Kreuzung” or Höller Strasse will be directed via Bahnhofstrasse to the “ARAL-Kreuzung”, then via Brumather Strasse (St 2111) and Bayernwerkstrasse back to the train station. However, access to BayWa, the Vogginger hairdresser and the BMW North parking lot remains possible from the direction of “Finsterwald-Kreuzung”. Cyclists should be prepared that the cycle path underpass from the direction of Kreuzstrasse is closed in the construction area and that they will be redirected to Höller Strasse.
Traffic monitoring made easy
The ADAC offers an excellent opportunity for anyone who would like to find out about the traffic situation at any time. On the platform adac.de Users can see the traffic flow and short-term disruptions in real time and plan their routes accordingly. This information is not only important for construction sites, but also indicates potentially dangerous situations such as slippery snow or storm warnings along the planned route.
While the construction work is temporarily disrupting traffic flow in Dingolfing, those responsible are committed to ensuring that the measures are carried out as quickly and as smoothly as possible. Stay informed and plan your trips ahead!