Massive traffic jams on the B17: Construction site ensures full closure now!

Massive traffic jams on the B17: Construction site ensures full closure now!
Augsburg, Deutschland - The motorway construction site on the B17 in Augsburg is currently causing considerable traffic disruptions. According to Augsburger General The asphalt session between the Eichleitnerstrasse junction and the border with Stadtbergen the southern road side. The direction of travel Landsberg is now fully locked. Road users must adapt to diversions that have been adjusted at short notice.
In both directions, traffic will only be continued on a trail until June 16, June 16. The Gabelsberger Straße and Liefshofer Straße junctions in the direction of Landsberg are closed. The diversion takes place from the LEIGERSHOFER Straße via Augsburger Straße, Isegrim-, Wellenburger-, BGM.-Aurnhammer- und Bürgermeister-Ulrich-Straße. Small-spacious diversions from Gabelsberger Straße are possible via Berg- and Peter-Dörfler-Straße. The junctions Nestackerweg and Eichleitnerstraße, on the other hand, are not affected and still accessible.
Details on the construction work
The construction work that started on Monday, June 9th is necessary because the whisper asphalt must be replaced on a distance of 2.6 kilometers. This measure takes place due to increased traffic quantities and serves the noise protection of the adjacent residential areas. According to Donaukurier , the B17 is reduced in each direction on a lane, which results in traffic disruptions. During the construction work, a speed limit of 50 km/h applies to increase safety.
from Monday, June 16, the northern road towards A8 motorway will also be affected, where there is also a full closure. In this direction, Gabelsberger Straße and the LEIGERSHOFER Straße are also closed until June 22. The detours run here via various streets such as Perzheim, Holzbach and BGM.-Sackermann-Straße and other alternative routes that are currently being set up. The whole thing is necessary because whisper asphalt has to be replaced every ten years to guarantee steady traffic safety and improved water drains in the rain.
traffic forecasts and tips
road users should adapt to traffic jams and delays in the entire area. The construction work takes place both during the day and at night to shorten the duration of the measure. This could lead to increased volume of traffic, which is why progressive driving and, if necessary, choosing alternative routes.
We know that construction sites like these are necessary not only here in Bavaria, but also in other cities, such as Berlin, where streets are regularly renovated. There, this also leads to significant traffic disorders, and the residents are often faced with closures, reports TAG24 . Similar to ours, there is information about changes in the traffic situation in good time.
The renovation work on the B17 is a step in the right direction, even if you are currently taking care of some small detours. Stay patient and strive to avoid traffic jams!
Details | |
---|---|
Ort | Augsburg, Deutschland |
Quellen |